The authors conducted a set of studies concerning the development of methodological support of multivariate predictive control reliability system for oil and gas industry. The algorithms, the innovative methods of calculation and the mathematical models of reliability factors, compatible with the modern production technological maintenance system, the system of dispatcher data registration, non-destructive testing diagnostics, and automated process control systems are developed. The mathematical software is designed to meet the technological features of the specific facilities, with applying the theory of process analysis, theory of reliability and fluctuation analysis elements. The developed models of reliability factors provide the possibility of predicting the parameters of technical facilities in a real time mode or for a fixed period, the structural and factor analysis function of the system in order to plan its optimal maintenance.
Monitoring technologies of MРC (multivariable predictive control) meet modern economical, production, and safety requirements based on the special continuous control of quantitative and running values of various factors: controllable, regulated, (set-points) and performance ones [1, 2].
For the prediction and assessment of the reliability of pipeline transportation and hydrocarbon storage facilities in real time, complex study of all the factors, phenomena and processes that determine various properties of the system reliability is necessary.
The analysis of existing studies indicates that, despite the urgency of the problem and a significant amount of research, existing techniques allow only a one-time assessment of reliability and are not focused on the use of immediate assessment and prediction in real time with the use of modern computer technologies [3- 6].
The subject of the study is the technology of reliability prognostic control, which requires the development of algorithmic and mathematical set.
Based on the analysis of the operating experience of the industrial facilities, it seems advisable to divide the sequence of the basic processes of design, implementation, and monitoring systems operation into several stages (Fig. 1). Stages 1, 2, 5, 6, and 7 are based on the results of theoretical and industrial research, while stages 3 and 4 are undertaken by organizations, developing information systems, as well as involved directly in construction and operating of the hazardous facility.
It is necessary to note, that possibilities and prospects of the implementation of the developed MРC system are not limited by only technological sphere of production: they are also focused on the scientific research and project institutes, regulatory authorities while evaluating the risk, choosing the complex of technological equipment for diagnostic and planned preventive maintenance, declaring organizations safety and so on.
Almost every system of technological or industrial monitoring and control contains information databank. The system of source data collection is constructed in such a way that can be generated at existing organizations using both current and new hardware.
For the analysis and control the system reliability, are formed structural and factor analysis algorithms, which, on a real-time basis, allow:
It should be noted that the basis for developing a methodology for monitoring the reliability of pipeline transportation facilities systems and sub-systems is a complex of requirements, including the following:
process parameters, planning, optimization and safe and effective control of the technical system as a whole.
That is why the developed monitoring is based on the system analysis method being practically the only one providing decision-making under conditions of a large amount of information of different nature. MPC implements the principle of continuous scanning of reliability factors (in the system, it is a controlled variable CV) and comparing the values obtained with the critical one (Fig. 2). Upon reaching the critical values of the controlled factors, the area and the type of technical intervention is determined.
With the purpose of implementing the estimation and analysis algorithms, we developed a set of mathematical models and calculation methods. Let the example be a methodology, based on the coefficient model of reliability factor.
There are various models for estimating technical facilities reliability: experimental models; “parameter dimensional limits”; “load – strength”; “load – bearing capacity”; model coefficients.
There is no doubt, that coefficient methods are the most efficient universal methods for the implementation under conditions of long equipment operating period, under uncertainty and lack of information, because they represent a simplified set of complex particular models.
The connection of reliability factors and operating conditions is provided by coefficients, considering the influence on the reliability factors: production technology characteristics; climatic factors; load factors: mechanical, electrical, etc.; facilities complexibility; maintenance characteristics etc.
Thus, the problem formulated above can be solved by using coefficient models in combination with expert assessment of the coefficients significance.
The practical importance of the research includes the development of the set of mathematical models and prediction methods for the decision support and reliability factors monitoring system, operating on a real-time basis and providing the transition from the “after-failure” system of maintenance and repair to the preventative one, based on predictive reliability data.